Case Study
THE BRIEF
Client: Confidential (Repeat Client) Location: South Yorkshire (85 miles from WCL base) System Used: Tor Coatings Unicover S – 10-Year Warranty Total Area: 467 m² Duration: 5 working days Access: MEWP access provided by WCL
Scope of Works
Wilson Coatings Limited were contracted for a full refurbishment of external cladding panels at an industrial unit in South Yorkshire. The goal was to extend lifespan, improve appearance, and apply a durable, long-term protective system.
Key tasks included:
• Full jet wash clean and degrease of 467 m² cladding
• Spot preparation and localised corrosion treatment
• Priming with Tor RC145 where required
• Spray application of Unicover S in 2 coats at correct DFT
• MEWP-based access and site safety management
Results & Benefits
✅ Enhanced protection with 10-year warranty
✅ Improved aesthetic appearance and uniform finish
✅ Increased lifespan of original cladding
✅ Delivered within time and budget